Before installation, reinstallation, or troubleshooting • Stop the DB/DL • Pull out the mains plug. • Relieve the DB/DL of any loads, which may be released during the work. Before start-up: • Make sure that the system has been installed as instructed in this User Manual. • Make sure that the voltage of the control box is correct before connecting the system to the mains. • System connection. The individual parts must be connected before connecting the control box to the mains. See the User Manual for LINAK actuators, if necessary. During operation: • If the control box makes unusual noises or smells, switch off the mains voltage immediately. • Take care that the cables are not damaged. • Unplug the mains cable on mobile equipment before moving it. • The products must only be used in an environment, that corresponds to their IP protection. Misc. The actuator system has a sound level below 55 dB(A) in typical applications. Updated manuals and declarations can always be found here: www.linak.com/deskline Page 6 of 42
Download PDF file