FlowCon Energy FIT System DN15-250 1B95086 - 03/2021 After installing and wiring each FlowCon Intelligent Interface according to the wiring diagram at their specific location together with the rest the FIT System equipment, all communication including other parameter settings in the FlowCon Intelligent Interface and FlowCon PICV BACnet actuator (SM.0.0.0.5/6) will be through the black BACnet I connecting BMS and FlowCon Intelligent Interface. If using a standard actuator (SM.0.0.0.3/4, FN.0.2/1.2 or FH/FH.1) without BACnet, BACnet communication will be between BMS and FlowCon Intelligent Interface. Please see FlowCon FIT BACnet PICS document for object default value and object setting list. FlowCon International assumes no responsibility for mistakes, if any, in any printed material. This paper is a supplement to the FlowCon FIT Instruction Latest release of any FlowCon material is available on www.flowcon.com Page 2 of 2
分享
打印
下载PDF文件