FlowCon Green 15-40 mm (1/2”-1 1/2”) 1B95092 - 10/2021 Installation and Operation Instruction The FlowCon Green inserts are for use with three different FlowCon valve housings, either: FlowCon A DN15-25 (1/2”-1”) FlowCon AB DN15-32 (1/2”-1 1/4”) FlowCon ABV DN15-40 (1/2”-1 1/2”) Insert Setting and Installation Prior to installing the FlowCon Green insert (sup- plied from factory in setting 5.0 due to calibra- tion), the system should be properly flushed. Blank valve covers are available to be installed during flushing. The desired flow rate is set by adjusting the insert (turn counter-clockwise to setting 1.0 and then clockwise up) with a special adjustment key. Range is between 1.0 and 5.0. ⚠ Do not overturn. Scale setting is located on top of the insert. For Green.0, Green.1 and Green.2, large white digits, numbered 1 to 5, indicate full turns and red digits, numbered 0 to 9, indicate 1/10 of full turn. For Green.1HF scale is op- posite . Here large green digits, num- bered 0 to 9, indicate 1/10 of full turn and black digits, numbered 0 to 5, indicate full turn. Flow setting may be done either before or after the in- sert is installed in the valve housing. Once flow is set and insert is fitted in the valve housing, the required actuator may be applied. Please see specific installation instruction for selected actuator. Turn to higher settings Turn to setting 1.0 It is recommended to grease the O-rings located around the insert and headnut with silicone grease before installing the insert in the valve housing. General Assembly Drawing FlowCon Green F C A: Valve housing B: Green insert D1 D2 B C: Adjustment keys D1: P/t plug (2 pcs.) D2: Plug (2 pcs.) E E E: Union end connections F: FlowCon actuator A Figure 1 This paper is a supplement to the FlowCon General Instruction Latest release of any FlowCon material is available on www.flowcon.com C Page 1 of 2
Download PDF file