FlowCon Energy FIT System DN15-250 1B95086 - 03/2023 After installing and wiring each FlowCon Intel- ligent Interface according to the wiring diagram at their specific location together with the rest the FIT System equipment, all communication including other parameter settings in the Flow- Con Intelligent Interface and FlowCon PICV BACnet actuator (SM.0.0.0.6) will be through the black BACnet I connecting BMS and FlowCon Intelligent Interface. If using a standard actua- tor (SM.0.0.0.3/4, FN.0.2 or FH/FH.1) without BACnet, BACnet communication will be between BMS and FlowCon Intelligent Interface. Please see FlowCon FIT BACnet PICS document for object default value and object setting list. FlowCon International assumes no responsibility for mistakes, if any, in any printed material. This paper is a supplement to the FlowCon FIT Instruction Latest release of any FlowCon material is available on www.flowcon.com Page 2 of 2
Share
Print
Download PDF file