n High capacity system with movable frame n Flush with rig side when stowed n Cantilevered from side when deployed VIKING SES-2A - with movable frame For offshore installations where all equipment must be stored within the deck of the installation Stored hydraulic power moves the evacuation system into cantilevered position for deployment, and after use retracts the system onto the deck. It comes complete with a fire retardant chute and integrated liferafts stored inside the blast proof container. It offers controlled launching and recovery in temperatures from -20ºC to +65ºC and can evacuate up to 140 persons within 10 minutes. Features n Robust high capacity transfer system n FPSOs, fixed and floating installations n Max. evacuation height of 50 metres n Operating temperatures from -20°C to +65°C n Flush with rig side when stowed and cantilevered when deployed n Integrated liferafts n Blast proof container n Max. evacuation capacity: 140 persons within 10 minutes 3
Download PDF file