Monteringsvejledning 1 2a 2b Start installation in the opposite direction of the prevailing wind. Install the tiles at eave first, ensuring proper overhang. Stagger the rows, by starting the second row with a half tile. Ensure proper waterproofing by aligning the overlapping guides. 3 4 The fixing on each corrugation should be done in the right order with ONDUVILLA® galvanized nails, between the 2 overlapping guides. Do not fix those corrugations that will be overlapped by the next tile or verge piece. 5a The aesthetics and wind uplift protection can be optimized by using the verge piece accessory, which is fixed on the top of the corrugation as well as on the sidewall. For the opposite gable end, cut the last tile at the edge of the roof and use a batten as a support for the corrugation. The last tile will be bent onto the batten, in order to ensure proper Ensure watertightness at ridge by applying our adhesive flashing tape ONDUBAND® (width 10 cm). If roof surface > 20 m², use our ventilated solution ONDULAIR SLIM. Cover the ridge with the Slim cap and fix it on each side of the roof, on top of the corrugations. The direction of the overlap is made according to prevailing winds. The Closure cap is recommended a neat finishing of your roof ! Der tages forbehold for fejl og tekniske ændringer. Artikel nr. 2004/0312 5b 6
Download PDF fil