FlowCon SM DN15-250 (1/2”-10”) 02/2024 Wiring If feedback signal is not required, leave green wire detached. Remember to remove the protection film from the actuator display to avoid condensation. FlowCon SM (analog) SM.0.0.0.3/4/6 Actuator 0(2)-10V modulating Black Blue White Green Input signal 0(2)-10V DC Feedback signal 0(2)-10V DC Power 24V AC/DC Ground/common FlowCon SM (digital) SM.0.0.0.3/4/6 Actuator 2-position, Normally Closed SM.0.0.0.3/4/6 Actuator 2-position, Normally Open Black Blue White Red Green Black Blue White Red Green Close Open Feedback signal Power 24V AC/DC Ground/common SM.0.0.0.3/4/6 Actuator 3-point floating, Normally Closed Stop Open Close Feedback signal Power 24V AC/DC Ground/common Black Blue White Red Green Open Close Feedback signal Power 24V AC/DC Ground/common SM.0.0.0.3/4/6 Actuator 3-point floating, Normally Open Stop Close Open Feedback signal Power 24V AC/DC Ground/common Black Blue White Red Green Start-Up Sequence When power is turned on, the actuator will auto- matically calibrate to determine closing point of the valve. Calibration can take up to 10 minutes depending on the valve’s position at start-up. During calibration actuator display will show “ CAL ”. Hereafter it will procced to normal opera- tion mode (according to control signal). If no control signal is detected, flush is started if enabled in the programming menu (enabled by default), opening the valve to 5/6 of fully open. Actuator display will show “ FLUSH ” until control signal is detected. At first start-up please enter programming menu to set actuator settings. This paper is a supplement to the FlowCon General Instruction Latest release of any FlowCon material is available on www.flowcon.com Page 3 of 8
Download PDF file