FlowCon FAC6HP with optional software Menu Units - must be chosen Multi-Block Window - for setting up wafers PcomPRO File About COMMISSIONING METER Title Buttons - mouse-over for explanations Project Details - auto hides Main Parts: Figure 1 Valve List - for selecting the valves and inserts Project Tree - overview of the setup of the project Project List - details for the valves in the project (slightly left) - this is the overview of the project. All valves must be listed under a group/level/area and thus even large projects with many valves can be sorted by dividing them into obvious groups/levels/ areas. To add/remove more groups/levels/areas or valves click the buttons just above the project tree. By default, the naming of the groups/levels/areas are “Level 1”, “Level 2”, “Level 3” 1 and so on, and the naming of the valves are “Valve 1-1”, “Valve 1-2”, “Valve 1-3” and so on, where the first number cor- responds to the group/level/area number so that valves in Level 2 will be named “Valve 2-1”, “Valve 2-2”, “Valve 2-3” and so on. Each group/level/area and valve can be renamed in the project tree by clicking 2 times on the cur- rent name (please be sure not to double click). The recommended maximum name length of the group/ level/area and valve in total is 18 characters, so abbreviations are recommended. Note 1: However in the default project the levels are named “Group 1”, “Group 2”, “Group 3” etc. Depending on the system, it is recommended to in- clude one or two extra valves in each group/level/ area to deal with valves not specified on the draw- ings/plans. Both the defined valves and their settings can be altered on the commissioning meter if necessary, but no new valves can be added (thus the above recommendation). All the valves imported from the FAC6HP are shown in the valve list on the left side of the screen, where they are divided into maker, then type/series, then model and lastly size. To find fx. a FlowCon Green.0, choose FLOWCON, then Green, then Green.0 and lastly 15-25mm. To define each valve in the project tree, find the re- spective valve in the left side of the screen, click on it (the size) and then drag and drop it onto the valve in the project tree to define that particular valve. To change an already defined valve, just repeat the procedure of defining it (click, then drag and drop). If an already defined valve is defined again, the pre- vious valve and settings will be overwritten by the new valve. To undo a defined valve, right-click it and choose “clear”. Denmark Dubai - 2 - USA Singapore www.flowcon.com 1F95610 - 04/2016 FlowCon International assumes no responsibility for mistakes, if any, in any printed material.
Download PDF file